Seymareh Dam & Hydropower Plant Project is located on the Seymareh River in Western Iran, some 37 KM from the city of Dareh Shahr in Ilam Province. The concrete powerhouse structure, with an annual energy production of 595 GWh, was awarded by the Iran Water and Power Development Company (IWPC) to the Consortium of Farab–Tablieh–Parhoon Tarh as the EPC contractor. The design works were carried on by the Swiss firm Poyry in a subcontract with the FTP consortium.

Powerhouse Dimensions (3 vertical axes 160 MW Francis units)

Size: 97.70(L)m ×51.65(H)m ×57.15(W)m

Location Ilam Province
Client Iran Water & Power Resources Development Co.
Consultant Mahab Ghodss Consulting Engineers
Scope of work:
Open Air Excavation 60,000 m3
Concrete 70,000 m3
Reinforcement 3,500 Tons
Formwork 48,000 m2